3 photos

Hempcrete blocks in Lyon and the metropolitan area: bio-based insulation made in Franche-Comté and delivered to your site.
Lyon’s heatwaves make summer comfort a priority. With a thermal lag of close to 19 hours at 30 cm, hempcrete pushes the peak heat back to the middle of the night, when ventilation becomes possible again.
Stone and rammed-earth walls in the Croix-Rousse, Vieux Lyon or the east of Lyon release moisture through evaporation. A breathable hempcrete lining respects the way they work, unlike an impermeable system.
Apartment buildings and offices subject to RE2020 are looking for bio-based materials. The BIOSYS system combines the blocks with a reinforced concrete post-and-beam frame, for a façade assembled by dry interlocking.
Our blocks are made in Mérey-sous-Montrond, around 260 km from Lyon. Site delivery is arranged with your order, through a short supply chain, for a material that is local by nature.
Request a priceOur blocks are sold through our network of partner merchants. Request your quote online with the postcode of your site: we will advise you and direct you to the nearest merchant to Lyon.
Our blocks are sold through our network of partner builders’ merchants and shipped from our factory in Mérey-sous-Montrond (Doubs), around 260 km from Lyon. Allow around one week for delivery on average, excluding the winter and summer holidays. Tell us about your project and we will put you in touch with the right contact within 48 working hours.
As a guide, based on public prices observed at merchants: from €35/m² incl. VAT for 10 cm, €51/m² for 15 cm, €66/m² for 20 cm and €95/m² for 30 cm. Your quote takes into account the surface area, the chosen thickness and delivery to your site in Lyon.
Yes. On an old stone or rammed-earth wall, an internal hempcrete lining insulates without trapping moisture, whereas an impermeable insulation can cause condensation and saltpetre. On more recent houses, external wall insulation greatly reduces thermal bridges without reducing the living space.
No special equipment is needed: MULTICHANVRE is laid with a lime-based mortar using a notched trowel, while BIOSYS interlocks dry, with no glue or mortar. Your mason can rely on our installation guide, available on the professionals page, and on advice from our hempcrete team. For BIOSYS, installation training is offered by our partner Vicat.
Tell us about your project: our team will reply within 48 working hours with a tailored price and the right product.
Request a quote